|
Once
you have decided upon the correct foundation for your paving slabs
you can really get started.
You
now need to mark out the area to be paved and dig it out to the
required level. Mark out the area using wooden pegs and a piece
of string and excavate the area so that it is level.
Then
we get a bit clever. To create the 1:40 fall you will need to do
the following:
Make
sure the ground you have excavated is level.
Place
two pegs of the same height 2 metres apart in your excavated area.
The
first peg should be at the highest point of your patio and the second
peg at the point where the patio will eventually slope.
Place
a spirit level on a piece of straight wood and place this on top
of the two pegs ( at this point the reading should indicate that
the ground is level.)
Take
a block of wood which is 50mm thick and place this on top of the
second peg ( the one which indicates the lowest point of the patio)
Your
spirit level will now show an incline.
Tap
the second peg into the ground until the spirit level shows a level
reading once again Remove the block of wood.
This
will now create a 1:40 slope Fill in with the appropriate foundation
Paving
>
|